+8618127974693

How To Install Wood Slat Pet Acoustic Panels?

Oct 26, 2022

How to install wood slat pet acoustic panels?


+_01

+_02

+_04

+_06

+_07

+_09

+_10

+_11

+_12

+_17

+_16

Wood slat pet acoustic panels not only offer aesthetic refinement and superior acoustic dampening, but they are also produced using only environmentally friendly materials. All of the materials are sourced from certified sustainable sources— a complete environmentally friendly product.wood slat pet acoustic panels is sound dampening and removes reverberation within the room, which drastically improves the acoustics within the room.


Simply screw wood slat pet acoustic panels straight into the wall, using the correct fixings, through the acoustic felt or if you are looking to increase the sound properties further, screwing them into batons. If installing on ceilings, the panels can be screwed straight into ceiling joists.


1 . Determine start point

(1). Determine the start point of first row of panels. Ensure centerline of wall and ceiling is established as per architectural drawings and align center of slat or centre of reveal accordingly.

(2). It is recommended to use an alignment method line to make sure the panels are properly positioned and squared as per design intent.


2 . Apply the construction adhesive

(1). Using the caulking gun and construction adhesive, apply the adhesive around the inner edge of the

ceiling panel. To avoid adhesive flowing through the joints when the panels are installed, apply the adhesive two finger widths away from the corner / join, then apply adhesive in a zig zag pattern across

the centre of the panel. 

(2). Apply the spray adhesive around the inner edge of the panel, 50-100mm widths away from the panel perimeter. Wait 5-10 minutes for the adhesive to be become tacky before installing the panels. 


3 .Hand pressure to wood slat pet acoustic panels

(1). Once in position, apply even hand pressure to the panel where the adhesive is located. Start at the

center of the panel, and work toward the edges. It is recommended that a sponge trowel be used toensure all glue spots are properly compressed.

(2). Fast grab adhesives provide an immediate bond,but have several minutes of worktime, allowing for proper alignment before panel is finally set.

(3). For panel assemblies that are adjacent to one another, it is recommended that a finish nail or small screw is used to lock panel in place when installing adjacent panels; place nails on Felt portion only, between wood slats. Avoid excessive movement to minimize panel shifting that could dislodge previously pressed areas and release the adhesive. 


FAQ

1.Can I get free samples and how long does it take to produce samples?

If the samples you need are in our stock, they will be provided to you free of charge. Customized samples usually take about a week to produce.


2. Do you accept OEM or ODM order?

Yes, as a manufacturer, we can produce acoustic materials based on your samples or drawings. Please do not hesitate to contact us.


3. How to get an accurate quotation?

Can provide us with detailed product information, such as pattern, core material, surface, etc. If you have CAD or other drawings, don't hesitate to send it to us.


4. Payment terms

T/T 30% deposit before production, 70% balanced payment before delivery.


For more information, please feel free to contact us.


Send Inquiry