+8618127974693

Precautions When Installing Sound-absorbing Panels

May 28, 2021

During the construction of the elevator shaft sound-absorbing board, the slurry prepared according to the requirements is evenly coated on the base surface to be prevented. When the water-front surface is waterproofed, because it is impossible to predict the possible water seepage parts, the dosage should be slightly increased to increase the impermeability of the waterproof coating as much as possible, and pay attention to the treatment of the honeycomb base surface.

During the backwater construction, even the slight leakage is easy to detect, and the leakage treatment should be carried out before the waterproof construction.

Pay attention to the cleaning and wetting treatment of the coated base surface (sufficient wetness, but no clear water). The coated waterproof coating must be maintained with a paint brush dipped in water or sprayed with a fine mist before the initial setting. This is very important for maintenance while coating. The coating exposed to the sun can be sprayed and cured with clean water for 1 to 2 days.


Send Inquiry